Projects

 

Garuda Indonesia - Jakarta -

Carried out 2 D Check on DC10, Lead Fitter on tail plane modifications working with McDonnell Design Team

 

 

Cranfield Institute of Technology -

Conversion of Hawker 748 to Water Bomber role consisting of details sheet metal work, working from drawings and in conjunction with design department

 

 

Schreiner Aircraft Maintenance - Libya –

Field maintenance/smw repairs/modifications on oilfield fleet Dash 8 and Twin Otter and Fokker 50/70

 

 

FLS - Stansted –

Carried out wing root modifications and strengthening on United Airlines 727 Fleet

 

 

Marshalls – RAF Lyneham –

C130 Hercules installed ‘Hot Spot’ modifications anti heat seeking missile systems

 

 

Eastern Airlines - Miami Florida -

Carried out D Check maintenance on Airbus A300 fleet

 

 

1992 to 1993 - Shorts Belfast

Production of Fokker 100 wings

 

 

1991 to 1992 - BAe Hatfield

Aircraft Production BAe 146, installation of flight deck infrastructure, working from drawings and under direction from design dept

 

 

Sogema – Bordeaux -

Lead Fitter carrying out D Checks and heavy sheet metal repairs on fleet Airbus A330 and A300

 

 

McDonnell Douglas – New York –

Carried out major structural repair on MD83, the aircraft had left the runway during thunderstorm and creased fuselage adjacent between seat rows 12 and 14.