Projects |
Garuda Indonesia - Jakarta - Carried out 2 D Check on DC10, Lead Fitter on tail plane modifications working with McDonnell Design Team
|
Cranfield Institute of Technology - Conversion of Hawker 748 to Water Bomber role consisting of details sheet metal work, working from drawings and in conjunction with design department
|
Schreiner Aircraft Maintenance - Libya – Field maintenance/smw repairs/modifications on oilfield fleet Dash 8 and Twin Otter and Fokker 50/70
|
FLS - Stansted – Carried out wing root modifications and strengthening on United Airlines 727 Fleet
|
Marshalls – RAF Lyneham – C130 Hercules installed ‘Hot Spot’ modifications anti heat seeking missile systems
|
Eastern Airlines - Miami Florida - Carried out D Check maintenance on Airbus A300 fleet
|
1992 to 1993 - Shorts Belfast Production of Fokker 100 wings
|
1991 to 1992 - BAe Hatfield Aircraft Production BAe 146, installation of flight deck infrastructure, working from drawings and under direction from design dept
|
Sogema – Bordeaux - Lead Fitter carrying out D Checks and heavy sheet metal repairs on fleet Airbus A330 and A300
|
McDonnell Douglas – New York – Carried out major structural repair on MD83, the aircraft had left the runway during thunderstorm and creased fuselage adjacent between seat rows 12 and 14.
|